Dell products l.p. (20240176723). PREDICTIVE LOAD DRIVEN PROACTIVE PRE-FLIGHT CHECK FOR APPLICATIONS simplified abstract

From WikiPatents
Jump to navigation Jump to search

PREDICTIVE LOAD DRIVEN PROACTIVE PRE-FLIGHT CHECK FOR APPLICATIONS

Organization Name

dell products l.p.

Inventor(s)

Parminder Singh Sethi of Ludhiana (IN)

Lakshmi Saroja Nalam of Bangalore (IN)

PREDICTIVE LOAD DRIVEN PROACTIVE PRE-FLIGHT CHECK FOR APPLICATIONS - A simplified explanation of the abstract

This abstract first appeared for US patent application 20240176723 titled 'PREDICTIVE LOAD DRIVEN PROACTIVE PRE-FLIGHT CHECK FOR APPLICATIONS

Simplified Explanation

The abstract describes a method for performing a connection test on an application before bringing it online, ensuring that all related applications and components have their connections re-established within a predetermined threshold.

  • The method determines the best time to perform a connection test on an offline application and conducts the test at that time.
  • The connection test is performed between the first application and all related applications and components to verify re-established connections.
  • The test helps ensure that the application can be brought online after a migration with all connections functioning within acceptable performance levels.

Potential Applications

This technology could be applied in various industries where applications need to be brought online after migrations or updates, such as in software development, IT infrastructure management, and cloud computing.

Problems Solved

1. Ensures that all connections between an application and related components are re-established before bringing the application online. 2. Helps prevent potential performance issues or downtime by verifying connections in advance.

Benefits

1. Reduces the risk of bringing an application online with incomplete or faulty connections. 2. Improves overall system performance by ensuring all connections meet predetermined thresholds.

Potential Commercial Applications

"Connection Test Prior to Bringing an Application Online" technology could be utilized by software companies, IT service providers, and cloud computing companies to streamline the process of migrating applications and ensuring seamless connectivity.

Possible Prior Art

One possible prior art could be the use of automated testing tools in software development to verify application connections before deployment. Another could be network monitoring systems used to check for connectivity issues in IT environments.

What is the impact of this technology on software development processes?

This technology streamlines the process of migrating applications by ensuring all connections are re-established before bringing the application online, reducing the risk of performance issues or downtime.

How does this technology contribute to overall system reliability?

By conducting connection tests prior to bringing an application online, this technology helps ensure that all related applications and components have their connections re-established within a predetermined threshold, improving system reliability and performance.


Original Abstract Submitted

embodiments described herein relate to methods, systems, and non-transitory computer readable mediums storing instructions for performing a connection test prior to bringing an application on-line. the method determines a best time to perform a connection test on an application that is currently off-line and at that time performs the connection test. the connection test is performed between the first application and those applications and components to which it is related. the connection test establishes whether prior to bringing the application on-line, for example after a migration, the connections between it and all the applications and components that are related to it have been re-established with performance within a predetermined threshold.