17994849. PREDICTIVE LOAD DRIVEN PROACTIVE PRE-FLIGHT CHECK FOR APPLICATIONS simplified abstract (Dell Products L.P.)

From WikiPatents
Jump to navigation Jump to search

PREDICTIVE LOAD DRIVEN PROACTIVE PRE-FLIGHT CHECK FOR APPLICATIONS

Organization Name

Dell Products L.P.

Inventor(s)

Parminder Singh Sethi of Ludhiana (IN)

Lakshmi Saroja Nalam of Bangalore (IN)

PREDICTIVE LOAD DRIVEN PROACTIVE PRE-FLIGHT CHECK FOR APPLICATIONS - A simplified explanation of the abstract

This abstract first appeared for US patent application 17994849 titled 'PREDICTIVE LOAD DRIVEN PROACTIVE PRE-FLIGHT CHECK FOR APPLICATIONS

Simplified Explanation

Embodiments described herein relate to methods, systems, and non-transitory computer readable mediums storing instructions for performing a connection test prior to bringing an application on-line. The method determines a best time to perform a connection test on an application that is currently off-line and at that time performs the connection test. The connection test is performed between the first application and those applications and components to which it is related. The connection test establishes whether prior to bringing the application on-line, for example after a migration, the connections between it and all the applications and components that are related to it have been re-established with performance within a predetermined threshold.

  • The innovation involves performing a connection test on an application before bringing it online, ensuring that all related applications and components have their connections re-established within a predetermined threshold.
  • The method determines the best time to conduct the connection test on the offline application, optimizing the process for efficiency and effectiveness.
  • The connection test is crucial after a migration to confirm that all connections are properly re-established before the application goes live.

Potential Applications

This technology could be applied in software development, system migrations, and network management to ensure seamless connectivity between applications and components.

Problems Solved

This technology solves the problem of potential connection issues between applications and components after a migration or system update, ensuring that performance remains within acceptable thresholds.

Benefits

The benefits of this technology include improved system reliability, reduced downtime, and enhanced performance by verifying connections before bringing an application online.

Potential Commercial Applications

Potential commercial applications of this technology include software development tools, network management systems, and cloud computing platforms.

Possible Prior Art

One possible prior art could be automated testing tools that check for connectivity issues between applications, but the specific focus on determining the best time to conduct the test and ensuring performance within a predetermined threshold sets this innovation apart.

Unanswered Questions

How does this technology handle complex network configurations with multiple dependencies between applications and components?

This technology is designed to handle complex network configurations by testing the connections between the first application and all related applications and components. By verifying each connection individually, it can ensure that even in complex setups, all dependencies are properly re-established.

What measures are in place to prevent false positives or false negatives during the connection test?

The method likely includes validation mechanisms to prevent false positives or false negatives during the connection test, such as multiple test iterations, performance thresholds, and error handling protocols. These measures help ensure the accuracy and reliability of the test results.


Original Abstract Submitted

Embodiments described herein relate to methods, systems, and non-transitory computer readable mediums storing instructions for performing a connection test prior to bringing an application on-line. The method determines a best time to perform a connection test on an application that is currently off-line and at that time performs the connection test. The connection test is performed between the first application and those applications and components to which it is related. The connection test establishes whether prior to bringing the application on-line, for example after a migration, the connections between it and all the applications and components that are related to it have been re-established with performance within a predetermined threshold.