18553205. RESOURCE DETERMINATION METHOD AND APPARATUS simplified abstract (DATANG MOBILE COMMUNICATIONS EQUIPMENT CO., LTD.)
Contents
- 1 RESOURCE DETERMINATION METHOD AND APPARATUS
- 1.1 Organization Name
- 1.2 Inventor(s)
- 1.3 RESOURCE DETERMINATION METHOD AND APPARATUS - A simplified explanation of the abstract
- 1.4 Simplified Explanation
- 1.5 Potential Applications
- 1.6 Problems Solved
- 1.7 Benefits
- 1.8 Potential Commercial Applications
- 1.9 Possible Prior Art
- 1.10 Unanswered Questions
- 1.11 Original Abstract Submitted
RESOURCE DETERMINATION METHOD AND APPARATUS
Organization Name
DATANG MOBILE COMMUNICATIONS EQUIPMENT CO., LTD.
Inventor(s)
RESOURCE DETERMINATION METHOD AND APPARATUS - A simplified explanation of the abstract
This abstract first appeared for US patent application 18553205 titled 'RESOURCE DETERMINATION METHOD AND APPARATUS
Simplified Explanation
The patent application describes a method and apparatus for determining resources in case of transmission failure.
- The method involves determining the physical resource where the transmission failure occurs.
- It then uses an association relationship between a scheduling request (SR) resource parameter and the physical resource parameter to determine an SR resource for the failed physical resource.
Potential Applications
This technology could be applied in telecommunications networks to efficiently manage resources in case of transmission failures.
Problems Solved
1. Efficient resource allocation during transmission failures. 2. Quick identification of alternative resources for failed physical resources.
Benefits
1. Improved network reliability. 2. Faster recovery from transmission failures. 3. Optimal resource utilization.
Potential Commercial Applications
"Resource Determination Method for Transmission Failures in Telecommunications Networks"
Possible Prior Art
There may be prior art related to resource allocation and management in telecommunications networks during failures, but specific examples are not provided in the abstract.
Unanswered Questions
How does this method handle multiple transmission failures simultaneously?
The abstract does not mention how the method deals with multiple transmission failures occurring at the same time.
What is the impact of this technology on network latency?
The abstract does not address how the resource determination method affects network latency during transmission failure scenarios.
Original Abstract Submitted
Disclosed in the present application are a resource determination method and apparatus. The resource determination method, including: determining a physical resource in which transmission failure occurs; and according to an association relationship between a relevant parameter of a scheduling request (SR) resource that is configured or predefined by a network side and a relevant parameter of the physical resource, determining an SR resource for the physical resource in which transmission failure occurs.