AUTOMATED METHOD AND PROCESSING TRAIN FOR LINING TUNNELS

Organization Name

HINFRA S.R. L.

Inventor(s)

Stefano Guanziroli of Erba (Como) (IT)

AUTOMATED METHOD AND PROCESSING TRAIN FOR LINING TUNNELS - A simplified explanation of the abstract

This abstract first appeared for US patent application 20240052743 titled 'AUTOMATED METHOD AND PROCESSING TRAIN FOR LINING TUNNELS

Simplified Explanation

The patent application describes a processing train that lays solidifiable fluid material on a tunnel wall to construct a lining, along with an advancement system, closing edge, and spouts for dispensing the material.

  • Processing train configured to run along a tunnel
  • Lays solidifiable fluid material on tunnel wall
  • Allows material to solidify for construction of tunnel lining
  • Advancement system for sliding form
  • Closing edge for closing space between form and tunnel wall
  • Spouts for dispensing material around front segment of form

Potential Applications

  • Construction of tunnel linings
  • Infrastructure development projects
  • Mining operations
  • Underground transportation systems

Problems Solved

  • Efficient and precise construction of tunnel linings
  • Minimizing manual labor and time required for lining construction
  • Ensuring uniformity and strength of tunnel linings

Benefits

  • Faster construction of tunnel linings
  • Reduced labor costs
  • Improved quality and durability of tunnel linings
  • Increased safety for workers involved in tunnel construction


Original Abstract Submitted

a processing train configured to run along a tunnel to lay a solidifiable fluid material on a wall of the tunnel and allow the solidifiable fluid material to solidify for construction of a lining of the tunnel, an advancement system for advancing the sliding form, a closing edge for closing a space between a front edge of the sliding form and the wall of the tunnel, and spouts for dispensing the solidifiable fluid material around a front segment of the sliding form. a method for constructing a lining of a tunnel with the solidifiable fluid material involves, defining an interspace between the front segment of the sliding form and the wall of the tunnel, introducing the solidifiable fluid material into the interspace and, after hardening time, advancing the sliding form to form a new interspace and successive lining sections.