18525120. METHOD FOR DETERMINING A PROJECT FLOW, ELECTRONIC DEVICE, AND STORAGE MEDIUM simplified abstract (BEIJING ZITIAO NETWORK TECHNOLOGY CO., LTD.)

From WikiPatents
Jump to navigation Jump to search

METHOD FOR DETERMINING A PROJECT FLOW, ELECTRONIC DEVICE, AND STORAGE MEDIUM

Organization Name

BEIJING ZITIAO NETWORK TECHNOLOGY CO., LTD.

Inventor(s)

Tao Hong of BEIJING (CN)

Dian Xiong of BEIJING (CN)

Chen Wang of BEIJING (CN)

Linxuan Shi of BEIJING (CN)

METHOD FOR DETERMINING A PROJECT FLOW, ELECTRONIC DEVICE, AND STORAGE MEDIUM - A simplified explanation of the abstract

This abstract first appeared for US patent application 18525120 titled 'METHOD FOR DETERMINING A PROJECT FLOW, ELECTRONIC DEVICE, AND STORAGE MEDIUM

Simplified Explanation

The method described in the abstract involves updating an execution project flow based on preset operations and triggered control targets. Here are some bullet points to explain the innovation:

  • Acquiring a to-be-used execution project flow with multiple flow nodes.
  • Updating the execution project flow when preset operations are detected.
  • Using the updated project flow when a target control is triggered.

Potential Applications

This technology could be applied in project management software, automation systems, and workflow optimization tools.

Problems Solved

This method streamlines project execution by automatically updating project flows based on preset operations and triggered controls, reducing manual intervention and potential errors.

Benefits

- Increased efficiency in project execution - Improved accuracy in following project flows - Enhanced automation capabilities in workflow management

Potential Commercial Applications

"Optimizing Project Flows with Preset Operations and Triggered Controls"

Possible Prior Art

There may be prior art related to project management software that automates certain tasks based on preset conditions, but further research is needed to identify specific examples.

Unanswered Questions

How does this method handle complex project flows with multiple branches and dependencies?

The abstract does not provide details on how the method manages intricate project flows with various branches and interdependencies. Further information on this aspect would be beneficial for a comprehensive understanding of the technology.

Are there any limitations to the types of projects or industries where this method can be effectively applied?

The abstract does not mention any restrictions or limitations on the applicability of this method to specific types of projects or industries. Understanding any potential constraints would help in assessing the technology's versatility and adaptability.


Original Abstract Submitted

A method includes acquiring a to-be-used execution project flow, where the to-be-used execution project flow includes multiple to-be-used flow nodes; in response to detecting that an operation on at least one to-be-used flow node is a preset operation, updating the to-be-used execution project flow; and in response to detecting that a target control is triggered, using the updated to-be-used execution project flow as a target execution project flow.