18352378. HYDROGEN SYSTEM OPERATION PLANNING DEVICE simplified abstract (KABUSHIKI KAISHA TOSHIBA)

From WikiPatents
Jump to navigation Jump to search

HYDROGEN SYSTEM OPERATION PLANNING DEVICE

Organization Name

KABUSHIKI KAISHA TOSHIBA

Inventor(s)

Junsuke Baba of Fuchu Tokyo (JP)

Takashi Akiba of Kawasaki Kanagawa (JP)

Fumiyuki Yamane of Kawasaki Kanagawa (JP)

HYDROGEN SYSTEM OPERATION PLANNING DEVICE - A simplified explanation of the abstract

This abstract first appeared for US patent application 18352378 titled 'HYDROGEN SYSTEM OPERATION PLANNING DEVICE

Simplified Explanation

The patent application abstract describes a system for efficiently planning operations in a hydrogen system by acquiring performance data, predicting performance, and correcting operation plans based on the predictions.

  • The acquisition unit gathers performance data on hydrogen production devices and tentative operation plans.
  • The prediction unit forecasts device performance during the planning period using the acquired data.
  • The planning unit adjusts the operation plan based on the performance predictions.

Potential Applications

The technology described in this patent application could be applied in various industries where hydrogen production systems are utilized, such as energy production, transportation, and manufacturing.

Problems Solved

1. Efficient operation planning in hydrogen systems. 2. Optimizing performance of hydrogen production devices.

Benefits

1. Increased operational efficiency. 2. Improved performance of hydrogen production devices. 3. Cost savings through optimized operation planning.

Potential Commercial Applications

Optimized operation planning in hydrogen production facilities for increased efficiency and cost savings.

Possible Prior Art

One possible prior art could be systems that use predictive analytics for operational planning in other types of industrial systems, such as power plants or manufacturing facilities.

Unanswered Questions

How does the system handle unexpected changes in performance data?

The system may need to include a mechanism for real-time adjustments to the operation plan based on new performance data.

What is the impact of inaccurate performance predictions on the operation plan?

It would be important to understand how deviations from predicted performance could affect the overall efficiency of the operation plan.


Original Abstract Submitted

To accurately prepare an operation plan that achieves efficient operation in a hydrogen system. In a hydrogen system operation planning device of an embodiment, an acquisition unit is configured to acquire performance data regarding performance of a plurality of hydrogen production devices and tentative operation plan data regarding a tentative operation plan tentatively prepared for the operation plan. A prediction unit is configured to acquire performance prediction data by predicting the performance of the plurality of hydrogen production devices during the planning target period based on the performance data and tentative operation plan data acquired by the acquisition unit. A planning unit is configured to acquire the operation plan by correcting the tentative operation plan based on the performance prediction data acquired by the prediction of the prediction unit.