Qualcomm incorporated (20240137195). CONFIGURED GRANTS AND SEMI-PERSISTENT SCHEDULING FALLING IN A PARTIALLY FULL DUPLEX SLOT simplified abstract

From WikiPatents
Revision as of 03:35, 26 April 2024 by Wikipatents (talk | contribs) (Creating a new page)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

CONFIGURED GRANTS AND SEMI-PERSISTENT SCHEDULING FALLING IN A PARTIALLY FULL DUPLEX SLOT

Organization Name

qualcomm incorporated

Inventor(s)

Ahmed Attia Abotabl of San Diego CA (US)

Marwen Zorgui of San Diego CA (US)

Muhammad Sayed Khairy Abdelghaffar of San Jose CA (US)

Abdelrahman Mohamed Ahmed Mohamed Ibrahim of San Diego CA (US)

CONFIGURED GRANTS AND SEMI-PERSISTENT SCHEDULING FALLING IN A PARTIALLY FULL DUPLEX SLOT - A simplified explanation of the abstract

This abstract first appeared for US patent application 20240137195 titled 'CONFIGURED GRANTS AND SEMI-PERSISTENT SCHEDULING FALLING IN A PARTIALLY FULL DUPLEX SLOT

Simplified Explanation

The patent application abstract describes a method for a user equipment (UE) or a base station to handle configured grants (CG) or semi-persistent scheduling (SPS) occasions that fall in a partially full-duplex slot. The UE receives an indication of a CG or SPS configuration, determines if the occasion overlaps in at least one symbol in a partially full-duplex slot, and communicates with the base station based on the overlap to modify the occasion.

  • Simplified Explanation:
 - Method for UE or base station to handle CG or SPS occasions in partially full-duplex slots.
 - UE receives indication of CG or SPS configuration, checks for overlap in slot, and communicates with base station to modify occasion.
      1. Potential Applications:

- Wireless communication systems - Mobile networks - Internet of Things (IoT) devices

      1. Problems Solved:

- Efficient handling of CG or SPS occasions in partially full-duplex slots - Avoiding error conditions or dropping occasions due to overlap

      1. Benefits:

- Improved communication reliability - Enhanced spectrum efficiency - Better utilization of resources

      1. Potential Commercial Applications:
        1. Optimizing CG or SPS Occasions in Partially Full-Duplex Slots

- Telecom companies - Network equipment manufacturers - IoT device manufacturers

      1. Possible Prior Art:

- Previous methods for handling CG or SPS occasions in wireless communication systems - Research on spectrum efficiency in mobile networks

        1. Unanswered Questions:
        2. How does the method determine the overlap in a partially full-duplex slot?

- The abstract does not specify the exact mechanism used by the UE to identify the overlap.

        1. What are the potential drawbacks of modifying CG or SPS occasions based on overlap?

- The abstract does not discuss any potential negative impacts or limitations of this modification process.


Original Abstract Submitted

aspects are provided which allow for a ue or a base station to handle cg or sps occasions that fall in a partially full-duplex slot. initially, the ue receives an indication of a configured grant (cg) or a semi-persistent scheduling (sps) configuration for allocating cg or sps occasions. next, the ue determines whether the cg or sps occasion overlaps in at least one sbfd symbol in a partially full-duplex slot based on the cg or sps configuration. afterwards, the ue communicates with a base station according to a modification to the cg or sps occasion based on the cg or sps occasion overlapping in at least one sbfd symbol in the partially full-duplex slot. as a result, the ue and the base station may handle instances where a cg or sps occasion falls in a partially full-duplex slot without identifying an error conditions or simply dropping the cg or sps occasion.